 If you want to know how long the production cycle (production time) of carbon steel seamless pipe is, you need to know what are the production methods of seamless steel pipe?

There are mainly the following processing methods for carbon steel seamless pipes:

1. Hot rolling

The hot rolling process is made by heating the steel billet to above 1000°C and undergoing rough rolling, finishing rolling and other processes. It is mainly suitable for the production of carbon steel and low alloy steel pipes, and can produce large diameter steel pipes. Generally, there is a minimum order quantity requirement, and the minimum order quantity of hot-rolled seamless steel pipe is relatively high. When the demand is low, production can be combined according to the production progress of different specifications in steel mills. For large-diameter hot-rolled seamless pipes, small orders of tens of tons mostly follow the production plan of the steel mill, and the production plan will not be arranged separately. The production speed of this product is fast. However, the production cycle of small batch orders is generally more than 20 days (the specific time needs to be arranged according to the production schedule).

2. Cold rolling

Cold rolling is carried out at room temperature and rolled by a cold rolling mill to produce small-diameter seamless steel pipes. The surface of the inner and outer diameter of the steel pipe is bright, and the error is small. Large and small batches are suitable for customization, the processing speed is slow, and the production cycle is generally about 10-15 days (the specific time needs to be arranged according to the production plan schedule).

3. Cold drawn

Cold drawn is a processing method to reduce the diameter of carbon seamless steel pipes, and is mainly used to produce small diameter steel pipes. The production quantity is flexible, the minimum order quantity is low, and both large and small orders can be produced. The outer diameter error of empty drawing is small and the surface is smooth, which is suitable for products with higher requirements on the outer diameter, but the inner diameter error is large. If there is a high error requirement for both inner and outer diameters, you can choose sandwich (inner diameter sandwich rod) for cold drawing. The production speed is fast, and the production cycle is generally about 7-10 days (the specific time needs to be arranged according to the production plan schedule).

4. Machining

Machining is the machining of carbon seamless steel pipes such as drilling and threading to make them into the desired shape and size.

5. Inspection

The produced carbon seamless steel pipes are inspected in terms of size, appearance and performance to ensure product quality.

https://www.steelweldedpipe.com/news/production-cycle-of-carbon-steel-seamless-pipe-152833.html

评论

此博客中的热门博文

Elbow for pipeline connection deliver to Southeast Asia

Xinyue fully supports African projects with fittings

Black and Galvanized Pipes and Fittings Supporting Drinking Water Pipeline Transmission in Asian