Welding Requirements for Large Diameter Straight Seam Steel Tubes
Large diameter straight seam steel pipe welding, including pre-welding, welding and welding outside the three processes. The so-called pre-welding that is, after the steel pipe forming, the use of continuous high-speed gas shielded welding (MAG) method of forming steel pipe positioning welding. After the pre-welding, respectively, within the steel pipe, multi-wire submerged arc welding. In the case of high-speed gas-shielded pre-welding, there are currently two methods. One is the use of single-wire dual-power high-current high-speed gas protection pre-welding, such as the United States, Germany that is used in this way; the other is double-wire high-speed gas protection pre-welding, Japan is the use of this method. At present, more applications are monofilament high-speed gas protection pre-welding method, in a reasonable welding process conditions, can achieve not less than 7m / min high speed, and straight bead forming beautiful. As the pre-welding of the first step of ...