Repeated order from 7-year cooperated regular customer

Project Location: INDIA Product: seamless steel pipe Material: DIN 2448 /DIN 1629 ST52(N.RR) Size: 323.9*16*1682MM 和 445*20*1682MM ,445*20*1889MM Usage:Rollers for textile and other mechanical processing Received the inquiry on August, 2022 Signed the contract on August, 2022 Delivery time: October, 2022 The first time we met with customer was at the 2015 German Fair, and we have been cooperating for 7 years since 2015. we still remember that at the German exhibition in 2015, both parties communicated a lot of technical details, including steel-making, deoxidation methods, how to avoid the phenomenon of no porosity, slag inclusion and delamination inside the steel pipe, as well as the dimensional tolerance. The customer requested that the outer diameter tolerance be plus or minus 0.75%, the wall thickness tolerance be plus or minus 5%, and the straightness be less than 1MM/M. Because the customer is a textile and other mechanical processing roller, the customer has very strict technica...

Carbon steel pipe welding process

 Welding problems are sometimes encountered during the installation of carbon steel tubes. So, how to weld tubes? What should we pay attention to when welding carbon steel tubes? 1. Gas welding Gas welding can be used for welding, which is to mix combustible gas and combustion-supporting gas together, use it as the heat source of the flame, and then melt and weld the pipes together. 2. Arc welding Arc welding can also be used, that is, arc welding is used as the welding method. A heat source that connects the pipes together. This welding method is often used in industrial production. In addition to the above two methods, the welded pipeline can also use contact welding, and the specific method to be welded depends on the material and requirements of the pipeline. Steel consists of iron and carbon with small amounts of miscellaneous metals, such as manganese, chromium, silicon, vanadium, and nickel. Low carbon steel contains only 0.3 percent carbon, making it incredibly easy to weld...

Chile steel pipe delivered successfully

Project location:Chile Product:ERW steel pipe Standard and material:SANS 657-3 2005 Specifications:101.6~177.8MM Usage:drive shaft Inquiry time:4th Feb, 2022 Order time:5th March, 2022 Shipping time:28th June, 2022 Estimated arrival time:ETA 15TH,AUGUST, 2022 The customer renewed the order and made a new purchase plan before receiving the goods from the previous order. After two weeks of negotiation, the customer is very satisfied with the Xinyue scheme, and the Xinyue price is within the target price. The customer directly sent the purchase contract and asked for the third party final inspection. In view of this order, the customer is anxious about the delivery time. In order not to delay the delivery time, Xinyue actively coordinates the production. Under the premise of ensuring the product quality, it is expected to complete the established project one week in advance The customer is very satisfied with the production task. https://www.xysteelpipe.com/chile-steel-pipe-delivered-succ...

Continuous supply of Vietnamese boiler tubes

Project location:Vietnam Product:SMLS PIPE Standard and material:12CrMo Specifications:30*6*6000MM Usage:Boiler pipe Inquiry time:2022.06.01 Order time:2022.06.03 Shipping time:2022.06.28 Estimated arrival time:2022.07.28 At the beginning of June, Xinyue received an inquiry for boiler tubes from an old customer in Vietnam. Due to the tight delivery time, the customer emphasized the delivery time problem at the beginning of the inquiry. Xinyue made the implementation with the production departments at the first time, and made a quotation to the customer after ensuring that the customer’s delivery requirements were met. After repeatedly confirming our production lead time, the customer asked us to wait for news. Since it is an old customer, Xinyue received a reply from the customer the next day. The customer expressed that he was very satisfied with Xinyue’s price and delivery time. For the purpose of reassuring customers, Xinyue rewritten the delivery terms in The draft contract is prov...

Xinyue was invited to participate in the construction of dome structure

Project location:Vietnam Products:ERW Steel Pipe, Rectangular Pipe Standard and material:GB/T3091、GB/T3094-2012, GB/T6728-2017、Q345B, Specifications:35 items sizes in total Application:Dome Structure Inquiry time:2022.03.09 Order time:2022.03.21 Departure time:2022.06.15 Arrival time:2022.06.30 The order came from Vietnam. The customer is a local steel trader who met in year 2018, we contacted each other by telephone at first, then had a formal visit to them during our marketing department visit in Vietnam. After sincere communication and negotiation, two sides reached the cooperation for the first time, now we have 4 years’ cooperation between us. The products previously cooperated have been highly praised by the end customers for many times, so the traders’ customers once again invited Xinyue to participate in the dome structure project (shown in the figure is the project reference diagram sent by the customer). This order has many types of specifications and tight delivery time. Aft...

Middle East Ship steel plate finished as scheduled

Project Location: Middle East Product: steel plate Material: CCS Grade A,CCS EH36,EN10025 S275JR Size: 6~16*2000*6000mm/8~30*3050*12000mm Usage:Ship steel plate Received the inquiry on December, 2021 Signed the contract on May, 2022 Delivery time:September, 2022 This time the standard of the steel plate is China Classification Society, which is used for ship plates. The customer will process the steel plate at the destination. In order to ensure the quality, we have carried out physical and chemical tests, impact tests during production. Customers have strict requirements for ship plates, requiring 3.2 certificates. In order to cooperate with customers, we coordinate the lifting of steel plate in the warehouse, find the steel plates of each furnace batch number and cut steel plates, and make physical, chemical and impact tests again. The customer is very anxious about the delivery date. We made a booking of bulk vessel in July as early as mid June. Due to the repeated impact of the epi...

Xinyue Pipeline Sets Sail to Africa

Project location:Africa Product:seamless pipes and fittings Standard and material:API 5L GrB PSL1 Specifications:2inch to 10inch SCH40/SCH80 Usage:Pipeline construction Inquiry time:2022.03 Order time:2022.03 Shipping time:2022.07 Estimated arrival time:2022.09 The customer today we are talking about is a contractor from Africa. The customer sent the first inquiry in 2019, the inquiry was for ordinary seamless pipes, but at that time the customer had not yet imported them, all the concerns, so there was no opportunity to deal. In March this year, after a teleconference, the customer deeply understood the strength and sincerity of Xinyue and finally placed this order to Xinyue as a trial order, which was 50 tons of seamless steel pipes and 30 tons of pipe fittings. After more than one month of production, all the products have been completed and passed the strict inspection of our quality inspection department, and are now waiting for shipment at Tianjin port, looking forward to the cus...

Good reputation brings new customer in Central Asia

Project Location: Uzbekistan Products:SEAMLESS STEEL PIPE Size: 18*2*6000MM Standard: GOST 8734 20# Application: Flow-meter Inquiry time:4th July, 2022 Purchase time: 8th Aug, 2022 Estimated Shipping time: 18 Aug, 2022 Estimated Arrival time: 18 Sep, 2022 The customer got the contact information of the business specialist from a big contractor in Uzbekistan, and then came to contact Xinyue inexplicably. At that time, he did not make specific inquiries, but just wanted to further understand our company for later cooperation. At the beginning of July this year, we received the customer’s inquiry of seamless precision tube, the size is 18*2mm. Although the quantity is not large, no matter the size of the order, Xinyue immediately offered the best price and scheme. This precision tube is Russian standard, which requires cold drawing process, and has strict requirements on straightness. The most important thing is that the delivery time is very urgent. Xinyue has supplied many similar pipes...

Anticorrosion of oil and gas pipelines

Because oil and gas pipelines are buried underground for a long time, they are very prone to corrosion problems due to soil, moisture and other factors. At present, pipeline corrosion in the petrochemical industry is mainly divided into two types: 1) External corrosion, the so-called external corrosion specifically refers to the corrosion caused by the connection between the metal material of the pipeline and the corrosive medium in the external environment.At the same time, since some pipelines have an insulation layer outside, moisture may accumulate under the insulation layer due to other factors (sometimes due to the high temperature of the medium in the pipe, the external moisture may be heated) to cause corrosion. 2) Internal corrosion, the so-called internal corrosion specifically refers to the corrosion of the inner layer of the pipeline. The types of internal corrosion that occur are different depending on the properties of the fluid in the pipeline. Including acid corrosion, ...

Xinyue Steel Pipe Exported to Chile

Project Location:Chile Product:ERW Steel Pipe Standard and material:ASTM A53 GR A Specifications:18”SCH STD Usage:Low liquid transmission pipeline Inquiry time:2022.05.10 Order time:2022.08.05 Shipping time:2022.09.05 Estimated arrival time:2022.10.20 This customer is from Chile. When we received the customer’s inquiry, it was only two days before the closing time. Moreover, the customer emphasized the issue of quality standards in the case of the product being delivered as soon as possible. The Xinyue team provides customers with perfect delivery support after synthesizing all relevant factors that affect the delivery time and considering the customer’s higher requirements for product quality. And help customers to successfully win the project. In the process of dealing with various types of customers, different from stockists and traders who are more wait-and-see about prices, contractors have strict requirements for product delivery. Xinyue team is always in the process of handling ...